Key Project History
- IH 37 and IH 410 San Antonio, Texas: Project management and lead design in hurricane evacuation and operational improvement project.
- Salado Creek Plant Decommissioning Project San Antonio, Texas: Deputy project management and lead design.
- VIA Bus Pads San Antonio, Texas: Project management and lead design on the construction of 27 bus pads throughout San Antonio.
- FM 1341 San Antonio, Texas: Lead design of roadway realignment and reconstruction project.
- FM 140 San Antonio, Texas: Project management and lead design of road reconstruction project.
- RM 1376, SH 127, FM 2771 San Antonio, Texas: Project Management and lead design on all three safety bond projects.
- SH130 Design/Build Toll Road, Austin, Texas: Contributed in the design of the roadway bid schematic. Also partook in the interim and ultimate designs to be built.
- SH45/US 183 Interchange Austin, Texas: Designed 2 storm sewer system lines located along the east side of this 5-level highway interchange using GeoPak drainage.
- IH 35/Binz Engleman San Antonio, Texas: Developed the preliminary and final (signed/sealed) drainage report with recommendations.
- IH 37 San Antonio, Texas: Developed scour analysis and report, using HEC-RAS 3.1, for major stream crossings at bridge structures within project limits.
- FM 969 San Antonio, Texas: Project management and coordination of project constructability and utility meetings.